How Long Does a Home Remodel Take? A Timeline for Maineville Homeowners

Planning a remodel but unsure how long it’ll take? RGV Contracting explains how long common home renovation projects take—from planning to final walkthrough—so Maineville homeowners know exactly what to expect.

April 17, 2025

Because “It Depends” Isn’t a Helpful Answer

If you’re thinking about remodeling your home, chances are you’ve asked the big question:

“How long is this going to take?”

The answer? It does depend—on the size of the project, the materials you choose, and even Ohio’s unpredictable weather. But don’t worry—we’re not leaving you with a vague shrug.

At RGV Contracting, we’ve completed remodeling projects of every size across Maineville, Mason, Lebanon, Springboro, and beyond. Today, we’re giving you a realistic timeline breakdown for the most common types of home renovations so you can plan with confidence.


Average Remodeling Timelines (Start to Finish)

Let’s break it down by project type 👇


1. Kitchen Remodel

Estimated Time: 4–8 weeks

Includes: Cabinet replacement, new countertops, appliances, layout adjustments, flooring, lighting

Factors that affect timing:

  • Custom cabinets vs. stock
  • Appliance availability
  • Plumbing or electrical changes

2. Bathroom Remodel

Estimated Time: 3–6 weeks

Includes: Vanity, tile, tub/shower upgrades, plumbing fixtures, lighting, flooring

Quicker if: You keep the original layout

Longer if: You're moving plumbing or adding luxury features like a custom shower system or soaking tub


3. Basement Remodel

Estimated Time: 6–10 weeks

Includes: Framing, drywall, electrical, flooring, bathroom install, entertainment zones, or guest rooms

Timeline tip: Basement work is less impacted by weather, which helps us stay on schedule even in winter.


4. Whole-Home Renovation

Estimated Time: 2–6 months

Includes: Multiple rooms, layout changes, flooring, HVAC, bathrooms, kitchen, interior finishes

These larger projects require more planning, more permits, and often include phasing to allow you to remain in the home during the work.


What Affects Remodel Timelines?

1. Scope of the Project

A quick refresh? Faster. A full gut and rebuild? Expect longer timelines.

2. Material Choices

Some countertops, flooring, or custom cabinets can have longer lead times. We help you choose smart to avoid delays.

3. Permits & Inspections

RGV handles all the local permitting for towns like Maineville, Mason, and Lebanon, but they can still take time depending on the project.

4. Change Orders

Changing your mind mid-project adds time. We recommend finalizing all your materials and layout before we start swinging hammers.


What You Can Expect When You Work with RGV

✅ Clear scheduling from day one

✅ Regular updates on progress

✅ Clean job sites and respectful crews

✅ A final walkthrough to ensure everything’s perfect

We’ve been remodeling homes across Warren County for years—and our clients love how stress-free and timely our process is.

“We knew what to expect before, during and after the job. RGV was on time, professional, and the work was excellent.”

– Kevin H., Lebanon, OH


🛠️ Ready to Start Your Remodel? Let’s Talk Timelines

We’ll Help You Plan It Right—Start to Finish

At RGV Contracting, we believe in being upfront and honest about what your remodel involves—including how long it will take. Whether you're remodeling your bathroom or refreshing your entire home, we’ll keep your project running on time and on budget.

📞 Give us a call or visit www.rgvcontracting.org to schedule your free consultation.

We’ll help you plan smart, stay on track, and fall back in love with your home—one phase at a time.

latest news

our blog

Stay updated with the latest tips, trends, and insights in home improvement. Explore expert advice on roofing, siding, decking, remodeling, and more from the team at RGV Contracting.

Sticky Call Button